Outpatient Pavilion Construction Project

330.263.8144

After breaking ground in April 2016, the next year in a half will be filled with northside expansion building progress. The new wing will house our comprehensive cancer center and Wooster Medical Oncology practice, an affiliate of The Ohio State University Comprehensive Cancer Center - James Cancer Hospital and Solove Research Institute (OSUCCC-James).

We know how important it is to keep patients local when you or a loved one is faced with a cancer diagnosis.  WCH will better serve cancer patients by offering advanced research and clinical trials offered through OSUCCC - The James Network. While construction is underway, our current cancer treatment facility is located at 2326 Eagle Pass Drive, Wooster. For more information please call our practice at 330.262.2800.

 

Read More About The Expansion Here
1
2
3


1
2
3

Below are renderings of what is to come for the new Comprehensive Cancer Center:


Wellness Suites (Infusion Bays)


Lobby /Family Waiting Area


Lobby/ Family Waiting Area

1
2

Current Construction Updates!

























Roofing Work in Process
1

Loading Dock Retaining Wall Placed
1



Ground floor Slab-on-Deck Pour #1
1

Ground Floor Slab-on-Deck Pour #1
1

Ground Floor Slab-on-Deck Pour #1
1

Storm Drain Lines and Chiller Piping Installed
1

Storm Drain Lines and Chiller Piping Installed
1

Ground Floor Slab-on-Deck ready to place
1

Ground Floor Slab-on-Deck ready to place
1

Chiller Piping work in process
1


Truck Dock Retaining Wall Footing in Process
1

Truck Dock Retaining Wall Footing in Process
1

Truck Docking Retaining Wall Footing in process
1


Electrical Underground Work in Process
1

Electrical Underground Work in Process
1

Chillers / Mechanical Piping in Basement
1


Partial Basement Wall 'B' Area Formwork
1

Partial Basement Wall 'B' Area Concrete Placed
1

New Chillers set in place
1

Elevator 'B' Masonry Tower Complete
1



Main Electrical Gear Arrives on Site
1

Bio-Swale Work
1

Partial Basement Wall 'B' Area Formwork
1

Partial Basement Wall 'B' Area Formwork
1

Elevator B Masonry Tower
1


Site overview


Underground plumbing and electrical work


Underground plumbing and electrical work


North Delivery/ access road cut to grade and stone base installed


Site overview


Fuel oil line installation in process
1

Basement wall waterproofing in process


Basement excavation in process.
1

Basement excavation in process.
1
2
Plumbing underground (roof drains) in process.
1

Site sanitary sewer work complete.
1

West parking area grading work in process.
1

1
Annex water line work being completed.
1


New main gas service piping being installed on the roof.
1

New east storm sewer "B" line installation in process.
1

Sanitary sewer main line re-routed
1

Annex building power lines being removed

New electrical primary conduits being installed
1
2
3

Check back soon for more updates as construction continues!